期刊文献+

基于时间扩展UML活动图的工作流过程建模方法 被引量:11

Workflow process modeling based on UML activity diagram with extended timing constraint
下载PDF
导出
摘要 为了严格管理与控制业务流程中的时间,对统一建模语言活动图进行了时间约束的扩展,充分考虑活动中资源的到来时间、资源有效时间、活动延迟时间、跃迁有效时间、延迟时间和活动截止时间共六种时间因素,建立基于时间统一建模语言活动图的工作流过程模型,并给予语义形式描述,增强了时间管理的全面性。鉴于时间复杂性,提出基于等待状态事件触发活动转移路由,解决了循环活动事件时间计算的问题。为了检验该方法的正确性、有效性和时间一致性,对Petri网时间验证方法进行了改进。通过对实例建模,验证了所提方法的合理性。 To manage and control the timing problems in business process strictly, the Unified Modeling Language (UML) activity diagram was extended with timing constraint by fully considering six time factors of arriving time, resources available time, activity delaying time, transition available time, delaying time and activity deadline. A workflow process model was created based on time UML activity diagram, and the semantic description was given for enhancing the comprehensiveness of time management. In view of the time complexity, a routing structure was proposed based on a waiting state with event triggering, which solved time calculation problem of cycle activities. To verify the correctness, validity and time consistency of proposed model, the Petri net method with time validation was improved, and the rationality of the proposed method was proved by instance modeling.
作者 蔡敏 卢佩
出处 《计算机集成制造系统》 EI CSCD 北大核心 2014年第7期1758-1767,共10页 Computer Integrated Manufacturing Systems
基金 国防基础科研计划资助项目(A3920110001) supported by the National Defense Basic Research Program China(No.A3920110001)
关键词 统一建模语言活动图 时间约束 工作流过程模型 语义描述 路由结构 模型验证 unified modeling language activity diagram timing constraint workflow process model semantic description routing structure model validation
  • 相关文献

参考文献14

  • 1王小花.基于扩展的UML活动图的工作流过程建模[D] :重庆:重庆大学,2005.
  • 2DUMANS M,TER HOFSTEDE A H M.UML activity diagrams as a workflow specification language[J].Lecture Notes in Computer Science,2001,2185:76-90.
  • 3ESHUIS R,WIERINGA R.A real-time execution semanticsfor UML activity diagrams[J].Lecture Notes in Computer Science,2001,2029:76-90.
  • 4CAI Yan.Comparative analysis of the workflow modeling[C] //Proceedings of International Conference on Management of e-Commerce and e-Government.Washington,D.C.,USA:IEEE,2012:226-229.
  • 5BENGHAZI K,GARRIDO J L,NOGUERA M,et al.Extending and formalizing UML 2.0 activity diagrams for the specification of time-constrained business processes[C] //Peoceedings of the 4th International Conference on Research Challenges in Information Science.Washington,D.C.,USA:IEEE,2010:93-100.
  • 6YOUNES A B,AYED L J,HLAOUI Y B.UML AD refinement patterns for modeling workflow applications[C] //Peoceedings of the 36th Annual Computer Software and Applications Conference Workshops.Washington,D.C.,USA:IEEE,2012:236-241.
  • 7LIU Xiao,YANG Yun,JIANG Yuanchun,et.al.Preventing temporal violations in scientific workflows:where and how[J].IEEE Transaction on Software engineering,2011,37 (6):805-825.
  • 8崔萌,袁海,李宣东,等.带时间约束的UML活动图模型的分析[EB/OL].[2013-03-21].http://d.g.wanfangdata.com.cn/Conference_3511043.aspx].
  • 9虞 甲.基于时间Petri网的工作流模型研究[D].杭州:浙江工商大学,2010.
  • 10李丹,陈启璋,刘强.一种基于Petri网的时间工作流模型的研究与验证[J].计算机工程,2007,33(7):78-80. 被引量:8

二级参考文献14

  • 1潘炎,汤庸.模糊时态工作流网的建模和时间可能性分析[J].计算机集成制造系统,2006,12(11):1779-1784. 被引量:8
  • 2宋巍,窦万春,刘茜萍.时间约束Petri网及其可调度性分析与验证[J].软件学报,2007,18(1):11-21. 被引量:21
  • 3LING S, SCHMIDT H. Time Petri nets for workflow modeling and analysis[C]//Proceedings of IEEE International Conference on Systems, Man and Cybernetics. Washington, D. C. , USA:IEEE,2000:3039-3044.
  • 4LI J Q, FAN Y S, ZHOU M C. Timing constraint workflow nets for workflow analysis [J]. IEEE Transactions on Systems, Man, and Cybernetics, 2003,33(2) :179-193.
  • 5TSAI JJP, YANG S J, CHANG Y H. Timing constraint Petri nets and their applications to schedulability analysis of real- time system specifications[J]. IEEE Transactions on Software Engineering, 1995,21 ( 1 ) : 32-49.
  • 6Eder J,Panagos E,Rabinovich M.Time Constraints in Workflow Systems[C]//Proceedings of the 11^th Conference on Advanced Information Systems Engineering.1999:1-14.
  • 7Ling S,Schmidt H.Time Petri Nets for Workflow Modeling and Analysis[C]//Proceedings of the IEEE International Conference on System,Man and Cybernetics.2000:3039-3044.
  • 8Marjanovic O.Dynamic Verification of Temporal Constraints in Production Workflows[C]//Proceedings of the 11^th Australian Database Conference.IEEE Press,2000:74-81.
  • 9Baeyens T.State of Workflow[Z].http://jbpm.org/2/state.of.workflow.html.
  • 10Chen Jinjun,Yang Yun,Chen T Y.Dynamic Verification of Temporal Constraints on-the-fly for Workflow Systems[C]//Proceedings of the 11^th Asia-Pacific Software Engineering Conference.IEEE Press,2000.

共引文献15

同被引文献96

  • 1张新昌.基于建模语言的城市轨道交通区域计算机联锁技术理论[J].吉首大学学报(社会科学版),2019,40(S01):140-144. 被引量:3
  • 2郭齐胜,王康,樊延平,胡国桥.武器装备需求分析方法[J].装甲兵工程学院学报,2013,27(5):8-12. 被引量:14
  • 3蒋彩云,王维平,李群.SysML:一种新的系统建模语言[J].系统仿真学报,2006,18(6):1483-1487. 被引量:39
  • 4刘怡,张子刚,张戡.工作流模型研究述评[J].计算机工程与设计,2007,28(2):448-451. 被引量:40
  • 5李占波,李娜.XML数据在关系数据库中的存储[J].微计算机信息,2007,23(27):192-194. 被引量:10
  • 6Chinosi M,Trombetta A.BPMN:An introduction to the standard[J].Computer Standards&Interfaces,2012,34(1):124-134.
  • 7WfMC.WFMC-TC-1025 process definition interface—XML process definition language version 2.2[S].Workflow Management Coalition,2012.
  • 8Van der Aalst W M P.Process mining:Discovery,conformance and enhancement of business processes[M].Springer,2011.
  • 9Marinalva S, Mauricio F, Adenilson T, et al. An approach for automation the satellite of routine' s operation and proce- dures [C/OL] //Exploring Innovation, The 13th International Conference on Space Operations. AIAA, Inc, [2014-05-02]. http://arc, aiaa. org/doi/abs/10. 2514/6. 2014-1846.
  • 10Steffen Z, Daniel S, Christian S. Command chain automation [C/OL] //Exploring Innovation, The 13th International Con- ference on Space Operations, [2014-05-02]. http://arc, aiaa. org/doi/abs/10. 2514/6. 2014-1817.

引证文献11

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部