摘要 针对柳树沟水电站导流洞的洞顶大塌腔,且不间断地掉石,施工中首先在塌腔下放置钢台车,在其保护下浇筑洞衬混凝土,后期向洞顶塌腔内采用固结灌浆的综合处理方案。经过近2 a的运行,塌腔处理效果良好。 Concerning the big top collapse cavity of the diversion tunnel, Liushugou Hydropower Station, and the continuous falling of rocks and stones, the steel trolley is stationed under the collapse cavity.With the trolley protection, the tunnel is concrete lined.Later, the top collapse cavity is treated by the operation of consolidation grouting.After two-year operation, the cavity treatment presents good effect.
作者 卞全
出处 《西北水电》 2014年第4期66-68,共3页 Northwest Hydropower
关键词 柳树沟水电站 导流洞 洞顶塌腔 钢台车 灌浆 Liushugou Hydropower Station diversion tunnel tunnel top collapse cavity steel trolley grouting
  • 相关文献

参考文献6

  • 1苗喆,王卫国,张新民.柳树沟水电站工程可行性研究报告6--工程布置及建筑物[R].西安:西北勘测设计研究院,2007.
  • 2沈启湘,何晓东,王飞.柳树沟水电站工程可行性研究报告4--工程地质[R].西安:西北勘测设计研究院,2007.
  • 3卞全,苗晶,冷云,等.新疆柳树沟水电站工程导流洞(兼泄洪洞)初期过流设计自检报告[R].西安:西北勘测设计研究院,2011.
  • 4顾一新,陈雷,鞠连义,吕辅君.小山水电站引水隧洞设计优化及塌方段处理[J].水力发电,1998,24(5):18-19. 被引量:2
  • 5贺国文.开都河柳树沟水电站泄洪洞塌方段空腔处理施工组织设计[R].西安:西北水利水电工程有限责任公司,2012.
  • 6宋万石.柳树沟水电站安全监测安装工程观测月报[R].贵阳:贵阳勘测设计研究院,2013.