期刊文献+

原油处理过程短期生产计划优化 被引量:3

Optimization of Short-Term Scheduling for Crude Oil Operations
下载PDF
导出
摘要 在原油处理过程短期生产计划的递阶求解方法中,原油处理短期生产计划问题分为上下两层,上层根据市场需求产生一个目标炼油计划;在此基础上,下层得到一个详细生产计划以实现目标炼油计划。研究了在上层目标炼油计划已知的情况下,下层详细生产计划的求解问题。为该问题建立了基于离散时间表示的混合整数线性规划模型,分析了问题的特点并将其进行转化,给出了基于启发式的求解方法,在保证目标炼油计划实现的前提下,对原油转运过程中油品切换及不同油品的罐底混合进行了优化,取得了一定的成果。用一个工业实例验证了启发式规则的可行性和有效性。 A short-term scheduling problem for crude oil operations can be divided into two levels by hier-archical method .At the upper level , a realizable refining schedule is obtained to optimize concerned ob-jectives.At the lower level a detailed schedule is gotten to realize it .A refining schedule is known in this paper, with the goal to find the detailed production scheduling to realize it .A mixed integer linear pro-gramming ( MILP) model based on discrete time representation is developed .After analysing the charac-teristic of the problem , it is transformed and can be solved by the heuristic algorithm which is presented in this paper .The algorithm not only ensures to obtain the target refining schedule , and also optimizes the switch-times of crude oil in oil transportation and the mix-times of tank heels .Finally , an industrial case study is presented to show the feasibility and validity of the proposed heuristic algorithm .
出处 《工业工程》 北大核心 2014年第3期79-85,共7页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(61273036)
关键词 炼油 详细生产调度 启发式 混合整数线性规划 优化 oil refining detailed production scheduling heuristic mixed integer linear programming(MILP) optimization
  • 相关文献

参考文献15

  • 1李雷,李秀喜,钱宇.集成库存管理的炼油厂生产排产建模[J].计算机与应用化学,2004,21(1):27-30. 被引量:4
  • 2Bechtel. PIMS ( Process Industry Modeling System) user' s manual[ M ]. USA : Bechtel Corporation, 1993.
  • 3Bonner Moore. RPMS( Refinery and Petrochemical Modeling System) : a system descriptive[ M]. USA: Bonner & Moore Management Science, 1979.
  • 4Shah N K, Li Z K, Ierapetritou M G. Petroleum refining op- erations : Key issues, advances, and opportunities [ J ]. In- dustrial & Engineering Chemistry Research, 2011, 50 (3) : 1161-1170.
  • 5Saharidis G K D, Minoux M, Dallery Y. Scheduling of load- ing and unloading of crude oil in a refinery using event-based discrete time formulation[ J]. Computers and Chemical Engi- neering, 2009, 33 (8) : 1413-1426.
  • 6Kelly J D, Forbes J F. Structured approach to storage alloca- tion for improved process controllability[ J]. AIChE Journal, 1998, 55(8) : 1832-1840.
  • 7Lee H, Pinto J M, Grossmann I E, et al. Mixed-integer lin- ear programming model for refinery short-term scheduling of crude oil unloading with inventory management[J]. Industri- al & Engineering Chemistry Research, 1996, 35 (5) : 1630- 1641.
  • 8Shan N. Mathematical programming techniques for crude oil scheduling [ J ]. Computers and Chemical Engineering, 1996, 20: 1227-1232.
  • 9Zhen Y J, Marianthi I. Refinery short-term scheduling u- sing continuous time formulation : crude-oil operations [ J ]. Industrial & Engineering Chemistry Research, 2003, 42 (13) : 3085-3097.
  • 10Floudas C A, Lin X X. Continuous-time versus discrete- time approaches for scheduling of chemical processes : a re- view[ J]. Computers & Chemical Engineering, 2004, 28 ( 11 ) :2109-2129.

二级参考文献23

  • 1伍乃骐,白丽平.炼油生产计划和调度优化的研究[J].计算机集成制造系统,2005,11(1):90-96. 被引量:31
  • 2Bonner & Moore. RPMS (Refinery and Petrochemical Modeling System): A System Descriptive[M]. Hoston TX, USA: Bonner & Moore Management Science, 1979.
  • 3PIMS System Reference, Version 11.0[M]. Cambridge, MA, USA: Aspen Technology Inc, 1999. Rigby B, Lasdon L S, Waxen A D. The evolution of Texaco's blending systems: From OMEGA to StarBlend[J] Interface, 1995, 25(5): 64-83.
  • 4Shah N. Mathematical programming techniques for crude oil scheduling[J]. Computers and Chemical Engineering 1996, 20(Suppl): 1227-1232.
  • 5Shah N. Mathematical programming techniques for crude oil scheduling[J]. Computers and Chemical Engineering, 1996, 20(Suppl): 1227-1232.
  • 6Lee H, Pinto J M, Grossmann I E, et al. Mixed integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management[J]. Industrial and Engineering Chemical Research, 1996, 35(5): 1630-1641.
  • 7Moro L F L, Pinto J M. Mixed-integer programming approach for short-term crude oil scheduling[J]. IndustriM and Engineering Chemistry Research, 2004, 43(1): 85-94.
  • 8Pinto J M, Joly M, Moro L F L. Planning and scheduling models for refinery operations[J]. Computers and Chemical Engineering, 2000, 24(9): 2259-2276.
  • 9Glismann K, Gruhn G. Short-term scheduling and recipe optimization of blending processes[J]. Computers and Chemical Engineering, 2001, 25(4/6): 627-634.
  • 10Rejowski R, Pinto J M. Scheduling of a multiproduct pipeline system[J]. Computers and Chemical Engineering, 2003, 27(8/9): 1229-1246.

共引文献5

同被引文献10

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部