期刊文献+

机载制导武器全寿命周期测试研究 被引量:1

Research on Airborne Guidance Weapon Life-Cycle Test
下载PDF
导出
摘要 针对机载制导武器设计、制造与维修保障中存在的资源和信息不能共享的问题,基于装备全寿命周期内的测试保障,对各阶段不同用户、不同目标测试所需测试设备研制提出统一的、标准化的设计方法;构建支撑装备全寿命周期信息模型的技术平台,使基于该平台的各阶段工作相互支援、相互影响,形成一个闭环的信息网络,最终实现设计、制造与维修的一体化。 Aiming at the resource and information which exist in the design , manufacture and main-tenance of airborne guidance weapon cannot be shared .Based on the test safeguard of equipment life-cy-cle,a uniform and standard design method to test equipments for various stage users and different goals is proposed , and a technology platform which supports equipment ’ s life-cycle information models is built . Based on this platform , various stage works support and influence each other , and produce a closed loop information network to realize the integration of design , manufacture and maintenance finally .
作者 琚保金
出处 《航空兵器》 2014年第4期62-66,共5页 Aero Weaponry
关键词 机载制导武器 全寿命周期 纵向集成测试策略 广域测试 airborne guidance weapon life-cycle vertical integrated test strategy ABBET
  • 相关文献

参考文献5

二级参考文献15

  • 1刘安清,郝建平,于永利,王松山.支持并行设计的维修性模型及其实现[J].计算机集成制造系统,2004,10(7):769-774. 被引量:8
  • 2张宝珍.基于信息的综合诊断体系结构及其在F-35联合攻击机研制中的应用[J].测控技术,2005,24(3):13-16. 被引量:9
  • 3Giarla A J,Simerly W L.Implementing an AI-ESTATE based diagnostic engine component[A].Proceedings DASC.The 19th[C].Digital Avionics Systems Conferences,Volume: 2,2000.Page(s):6B3/1-6B3/9.
  • 4Neblett B.Implementing reusable,instrument independent test programs in the factory[J].IEEE Aerospace and Electronics Systems Magazine,1997,12(6):29-34.
  • 5Mathur A,Haste D,Domagala C.Application of a dependency-model-based health inference and troubleshooting strategy to a HUMS-enabled advanced maintenance concept[A].American Helicopter Society 59th Annual Forum[C].Phoenix,Arizona,2003.
  • 6Simpson W R,Sheppard J W.A mathematical model for integrated diagnostics[J].IEEE Design&Test of Computer,1991,8 (6):25-38.
  • 7Simpson W R,Sheppard J W.System testability analysis for integrated diagnostics[J].IEEE Design & Test of Computer,1992,9(2):40-52.
  • 8Simpson W R,Sheppard J W.Applying testability analysis for integrated diagnostics[J].IEEE Design & Test of Computer,1992,9(3):65-78.
  • 9Deb S,Krishna R,Raghavan V.Multi-signal flow graphs:a novel approach for system testability analysis and fault diagnosis[J].IEEE AES Systems Magazine,1995,(5):14-25.
  • 10Pattipati K R,Raghavan V,Shakeri M,et al,TEAMS:testability engineering and maintenance system[A].American Control Conference[C].1994:1989-1995.

共引文献26

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部