摘要 施工模拟是超高层建筑结构设计的重要内容。施工过程中结构的材料参数、几何参数、荷载和边界条件等都随施工进程而改变,施工结束后的内力和变形与施工过程、时间效应密切相关。利用Midas/gen有限元软件,对某超高层建筑结构进行了考虑混凝土收缩徐变影响的施工模拟研究,分析了收缩徐变对核心筒和框架柱竖向变形、竖向变形差及内力等因素的影响;并对不同施工方案下结构的竖向变形差异及风振影响等问题进行了研究。 Simulation is a super high-rise building construction structural design of important content. Construction process structure of the material parameters, geometrical parameters, load and boundary conditions are all changed with the construction process, after the construction of the internal forces and deformation and construction process, time effects are closely related. Using the Midas/gen structural finite element software, a high-rise building structures were considered effects of shrinkage and creep construction simulation studies to analyze the influence of the creep and shrinkage on the core barrel and frame column vertical deformation, vertical deformation and internal force poor factors. And the vertical deformation differences and other issues under different construction schemes were researched.
出处 《施工技术》 CAS 北大核心 2014年第16期102-107,共6页 Construction Technology
关键词 高层建筑 施工模拟 竖向变形差 收缩 徐变 风振响应分析 tall buildings simulation vertical deformation difference shrinkage creep wind vibration response analysis
  • 相关文献

参考文献9

  • 1JGJ3-2010高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2011.
  • 2Fintel M, Chosh S K. Highrise design: accounting for column length change[ J]. Civil Engineering, ASCE, 1984.
  • 3Choi Chang-Koon,Kim E-Doo. Multistory frames under sequential gravity loads [ J]. Journal of Structural Engineering, ASCE, 1985, 11(11 ) :2373-2384.
  • 4Chowdhury Ashfaque Ahmed. An object oriented finite element formulation for construction simulation [ D ]. Lehigh University, 1994.
  • 5中交公路规则设计院.JTGD62-2004公路钢筋混凝土及预应力混凝土桥涵设计规范[s].北京:人民交通出版社.2004.
  • 6钟国坤.广州某商业广场西塔楼施工仿真分析及施工监测[D].广州:华南理工大学,2011.
  • 7王化杰,范峰,支旭东,黄刚,祝恩淳,王宏.超高层结构施工竖向变形规律及预变形控制研究[J].工程力学,2013,30(2):298-305. 被引量:28
  • 8李烨,王建,周建龙.超高层建筑施工模拟分析的非荷载效应应用研究[J].建筑结构,2012,42(5):159-163. 被引量:10
  • 9时光涛.高层建筑结构风致振动数值模拟[D].合肥:合肥工业大学,2012.

二级参考文献15

共引文献294

同被引文献88

引证文献17

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部