热害矿井多级机站通风降温的实践 被引量:1

Practice of multistage fanstation ventilation for cooling against heat hazard in mine
下载PDF
导出
摘要 针对沂南金矿金龙矿区深井地热危害严重的情况,分析了矿井通风系统存在的问题。在此基础上,经过2个方案对比,结合地温预热防止入风井防冻,选用了分区多级机站通风降温系统方案;自主开发了通风网络解算程序;经实际应用使得金龙矿区井下作业面温度显著下降,同时解决了冬季入风井结冰的问题。工程实践表明,多级机站通风系统和地温预热入风井防冻技术在金属矿山降温治理和防止入风井结冰方面具有实用价值。 Serious heat hazard happening in deep mineof Jinlong mining area, Yinan Gold Mine has led to the check of existing problems in the mine ventilation system. Besides, after comparision of two schemes and geothermal preheating to prevent downcast freezing, partition multistage fan station ventilation cooling system scheme is selected. The ventilation network calculation program is developed independently. Practices prove a significant temperature drop in the operation stages of deep mineof Jinlong mining area, and at the same time the downcast freezing problem in win- ter is solved. Engineering practice has proved, multistage fan station ventilation system and technology of geothermal preheating to prevent downcast freezing have practical value in metallic mine temperature treatment and prevention of downcast from freezing.
出处 《黄金》 CAS 2014年第9期45-48,共4页 Gold
基金 山东省科技攻关计划项目(2007GG20007003) 中国博士后科学基金资助项目(2013M541934)
关键词 多级机站 通风系统 网络解算 通风降温 地温预热 multistage fan station ventilation system network solution ventilation cooling geothermal preheating
  • 相关文献

参考文献5

二级参考文献2

共引文献58

同被引文献13

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部