摘要
在施工测量放样中,放样数据计算的正确与否直接决定放样的成败。而放样数据处理计算往往数据量大、复杂,怎样快速、直接、方便、简单获取放样数据一直以来是测量技术员研究和探讨的重点和难点。本文以某楼盘二期桩基施工放样测量为例,着重介绍CAD在桩基工程施工测量放样数据计算的应用。
During construction survey and lofting, the correctness of lofting data calculation directly determines the success of lofting. However, the data calculation is often large and complex. How to get lofting date fast, directly and conveniently is always a key and difficult point explored by surveyors. Taking the survey and lofting of the second-stage pile foundation construction of a real estate as an example, the application of AutoCAD in surveying and calculating lofting data of pile foundation construction is explained.
出处
《长江工程职业技术学院学报》
CAS
2014年第3期12-14,共3页
Journal of Changjiang Institute of Technology