初始信任对工程项目管理绩效的影响研究:合同柔性、合同刚性的中介作用 被引量:22

Research on the Influence of Initial Trust to Project Management Performance:The Intermediary Role of Contractual Flexibility and Rigidity
下载PDF
导出
摘要 信任对工程项目管理绩效影响的研究多是基于组织行为学的视角,而本文则从项目治理的视角展开。通过理论分析构建了工程项目中合同柔性、合同刚性的构念,并对其进行了维度划分;梳理和总结相关文献提出了以初始信任为前因、合同柔性和合同刚性为中介、工程项目管理绩效为结果的概念模型,并分析了其具体作用路径;研究结论为业主提供的管理启示包括:(1)应高度重视资格预审工作,选择初始信任水平较高的承包商;(2)应根据对投标人的平均初始信任水平编制招标文件,为合同适当地注入柔性和刚性;(3)中标后、签约前的合同谈判很必要,要在不背离合同实质性内容的前提下,根据对承包商的确切初始信任水平微调合同的柔性程度。 Most researches on the influence of trust to project management performance in construction projects are from the perspective of organizational behavior, while it is reexamined from the perspective of project governance in this paper. Through a thorough literature review, the theoretical constructs of contractual flexibility and contractual rigidity are established and their dimensions are analyzed. And then a conceptual model including initial trust, contractual flexi- bility, contractual rigidity and project management performance is developed and its effect route is explored. Three sug- gestions offered to the owners are as follows : ( 1 ) prequalification should be attached great importance in order to select a more trustworthy contractor; (2)bidding documents should be prepared according to the average level of initial trust to all the tenderers so as to inject flexible and rigid items into the contract ; (3) it is necessary to negotiate with the contrac- tor after its acceptance of the bid and before their signing of the contract, the contractual flexibility should be adjusted slightly according to the exact initial trust level to the contractor without any change of its substantial contents.
出处 《预测》 CSSCI 北大核心 2014年第5期23-29,共7页 Forecasting
基金 国家自然科学基金资助项目(71372110 71002066)
关键词 初始信任 工程项目管理绩效 合同柔性 合同刚性 不确定性 initial trust project management performance contractual flexibility contractual rigidity uncertainty
  • 相关文献

参考文献34

  • 1Saad I M H. Construction contracts: from zero-sum to win-win[ A ]. Annual Conference-Canadian Society for Civil Engineering 2011 ( CSCE2011 ) [ C ]. Carleton University Press, Ottawa, 2011. 2620-2628.
  • 2YeungJ F Y, Chart A P C, Chan D W M. Defining rela- tional contracting from the wittgenstein family-resemblance philosophy [ J ]. International Journal of Project Manage- ment, 2012, 30(2): 225-239.
  • 3David S F, Mayer R C, Davis J H. An integrative model of organizational trust: past, present, and future [ J 1. Academy of Management Review, 2007, 32(2): 344-354.
  • 4Doloi H. Relational partnerships: the importance of communication, trust and confidence and joint risk man- agement in achieving project success [ J ]. Construction Management and Economics, 2009, 27 ( 11 ) : 1099-1109.
  • 5Meng X. The effect of relationship management on project performance in construction [ J 1- International Journal of Project Management, 2012, 30(2) : 188-198.
  • 6Kadefors A. Trust in project relationships-inside the black box [ J]. International Journal of Project Manage- ment, 2004, 22(3): 175-182.
  • 7Wong P S P, Cheung S O. Structural equation model of trust and partnering success[ J]. Journal of Management in Engineering, 2005, 21 (2) : 70-80.
  • 8Pinto J K, Slevin D P, English B. Trust in projects: an empirical assessment of owner/contractor relationships [ J ]. International Journal of Project Management,2009, 27(6): 638-648.
  • 9Cheung S O, Yiu T W, Lam M C. Interweaving trust and communication with project performance [ J]. Journal of Construction Engineering and Management, 2013, 139 (8) : 941-950.
  • 10Williamson O E. The mechanisms of governance [ M ]. Oxford: Oxford University Press Inc, 1996.

二级参考文献34

  • 1杨萍,刘先涛.BOT项目中信用风险的动态均衡分析[J].商业研究,2005(13):156-157. 被引量:5
  • 2赵亚东,赵希男.论刚柔并济的激励体系构建[J].现代管理科学,2005(11):20-22. 被引量:17
  • 3金娜,杨乃定,高婧.基础设施项目区域投资PFI模式风险分析[J].软科学,2007,21(1):10-13. 被引量:8
  • 4高峰,郭菊娥,赵强兵.基于障碍期权的基础设施项目政府担保价值研究[J].预测,2007,26(2):76-80. 被引量:16
  • 5Mei-yung Lung, Anita M.M. Liu, S. Thomas Ng. Is there a relationship between construction conflicts and participants' satisfaction.Engineering, Construction and Architectural Management, 2005(2).149-167.
  • 6Gebken II, Richard J, Gibson, G. Edward. Quantification of costs for dispute resolution procedures in the construction industry.Journal of Professional Issues in Engineering Education and Practice, 2005.889-898.
  • 7Helen S. Ng, Feniosky Pe?a-Mora, Tadatsugu Tamaki. Dynamic conflict management in large-scale design and construction projects.Journal of Management in Engineering, 2007(4).52-66.
  • 8Daragh Daly. Appropriate resolution procedures-some challenges .Engineers Journal, 2008 (4).224-228.
  • 9Li Binga, AKINTOYEA A, EDWARDS P J, HARDCASTLEA C. The allocation of risk in PPP/PFI construction projects in the UK [J]. International Journal of Project Management, 2005, 2(23): 25-35.
  • 10FELIX O G, HANNELORE W H. Pricing road use: politicoeconomic and fairness considerations [J]. Transportation Research Part D, 2002, 7(5): 357-371.

共引文献55

同被引文献276

引证文献22

二级引证文献97

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部