新工件到达干扰下单机最大延迟时间重调度 被引量:9

Single-machine rescheduling of minimizing the maximum lateness with the disruptive arrival of new jobs
下载PDF
导出
摘要 在一批新工件突然到达的干扰条件下,研究了总序位干扰量受上限的单机最大延迟时间重调度问题.在建立起若干结构化占优性质和针对部分排序的两种下界计算式的基础上,开发了含两阶段的启发式算法以及精确求解问题的分支定界算法.通过数值实验对比考察了分支定界算法在较小规模算例上的计算效率,并分析了两阶段启发式算法在较大规模算例(总工件数n不小于100)上的解质量与适用条件.实验结果表明,所提分支定界算法在n不超过16算例上的计算耗时显著优于CPLEX优化软件;对于干扰容许率不小于0.6,或者新工件比例不小于0.95干扰容许率在0.1以内的较大规模算例,宜采用所提出的两阶段启发式算法进行求解. Under an unexpected arrival of new jobs, this paper considers the single-machine maximum late- ness rescheduling problem subject to an upper limit on the total sequence disruption. Several problem-specific structural properties and two lower bounds related to partial sequences are first established. Subsequently, a two-stage heuristic algorithm and an exact branch-and-bound algorithm are developed to solve of this problem. In our numerical experiments, the efficiency of the branch-and-bound algorithm was comparatively examined for small-sized instances, and solution quality and applicability of the two-stage heuristic algorithm were ana- lyzed for instances with not less than 100 jobs. Experimental results reveal that the branch-and-bound algorithm significantly outperforms the CPLEX optimizer in execution time for instances with up to 16 jobs, and in case of tolerance rates not less than 0.6, or ratios of new jobs not less than 0.95 corresponding to tolerance rates less than 0.1, the two-stage heuristic algorithm is recommended for relatively large-sized instances.
作者 刘乐 周泓
出处 《系统工程学报》 CSCD 北大核心 2014年第4期494-506,共13页 Journal of Systems Engineering
基金 国家自然科学基金资助项目(71071008) 教育部人文社科研究青年基金资助项目(14YJCZH098) 济南大学科研基金资助项目(XKY1322)
关键词 重调度 单机 最大延迟时间 序位干扰量 启发式 分支定界 rescheduling single machine maximum lateness sequence disruption heuristic branch and bound
  • 相关文献

参考文献23

  • 1Wu S D, Storer R H, Chang P C. One-machine rescheduling heuristics with efficiency and stability as criteria[J]. Computers and Operations Research, 1993, 20(1): 1-14.
  • 2庞新富,俞胜平,张志宇,郑秉霖,柴天佑.炼钢-连铸生产优化重调度方法[J].系统工程学报,2010,25(1):98-103. 被引量:26
  • 3庞新富,俞胜平,罗小川,潘全科,柴天佑.混合Jobshop炼钢-连铸重调度方法及其应用[J].系统工程理论与实践,2012,32(4):826-838. 被引量:25
  • 4Azizoglu M, Alagoz O. Parallel-machine rescheduling with machine disruptions[J]. IIE Transactions, 2005, 37(12): 1113-1118.
  • 5Vieira G E, Herrmann J W, Lin E. Rescheduling manufacturing systems: A framework of strategies, policies, and methods[J]. Journal of Scheduling, 2003, 6(1): 39-62.
  • 6Ouelhadj D, Petrovic S. A survey of dynamic scheduling in manufacturing systems[J]. Journal of Scheduling, 2009, 12(4): 417-431.
  • 7Fahmy S A, Balakrishnan S, ElMckkawy T Y. A generic deadlock-free reactive scheduling approach[J]. International Journal of Production Research, 2009, 47(20): 5657-5676.
  • 8Hall N G, Potts C N. Rescheduling for new orders[J]. Operations Research, 2004, 52(3): 440-453.
  • 9胡祥培,孙丽君,王雅楠.物流配送系统干扰管理模型研究[J].管理科学学报,2011,14(1):50-60. 被引量:39
  • 10Dong Y H, Jang J. Production rescheduling for machine breakdown at a job shop[J]. International Journal of Production Research, 2012, 50(10): 2681-2691.

二级参考文献94

共引文献92

同被引文献113

引证文献9

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部