赤大白铁路巴彦段增建二线线路方案研究 被引量:1

Research on the Second Line Construction Project of Chifeng-DabanBaiyinhua Railway Bayan Section
下载PDF
导出
摘要 赤大白铁路巴彦段既有线为R=600 m的回头曲线,在该线扩能工程的研究过程中,本段的增建二线方案影响到线路主要技术标准的选择。从线路方案研究的总体思路出发,综合线位对移民新村的影响和工程投资、水害治理、线路纵坡的选择等多种因素,对R=600 m、R=700 m、R=800 m的方案进行了综合比选。 Bayan section lines of Chifeng-Daban-Baiyinhua railway is a back curve of R =600 m.In the study on the capaci-ty expansion,it is found that the selection of second line scheme has great impact on the main technical standards of the rail-way.In this paper,from the general idea of the route,a comprehensive comparison and selection of R =600 m,R =700 m, R =800 m solutions is made from perspectives of the comprehensive effects of various factors on immigrants and project in-vestment,water treatment,the choice of longitudinal slope.
作者 李志鹏
出处 《铁道建筑技术》 2014年第8期57-59,共3页 Railway Construction Technology
关键词 增建二线 方案比选 既有线扩能 second railway construction scheme comparison existing capacity
  • 相关文献

参考文献2

  • 1黄群.锦州港至白音华铁路可行性研究报告[R].北京:中铁第五勘察设计院集团有限公司,2013:35.
  • 2易思睿.铁路选线设计[M].成都:西南交通大学出版社,2001:47-48.

共引文献1

同被引文献5

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部