摘要
锦赤铁路高桥段线路距离锦州市及葫芦岛市经济技术开发区较近,经济发达,居民点多,人口密集,且需连续跨越国道102、京沈高速公路、沈山线、京哈线秦沈段,线路方案关系复杂。在对影响线路方案的各种因素进行归纳分析以后,提出可行的线路方案,并对其进行技术经济比较,得出推荐方案的研究结论。
Gaoqiao section of Jinzhou-Chifeng railway lies beside the Economic and Technological Development Zone of Jinzhou and Huludao city with a highly developed economy and a big population.Meanwhile,it has to cross over State Road 102,Beijing-Shenyang expressway,Shenyang-Shanhaiguan line,Beijing-Harbin line Qinshen section,which makes the plan rather complex.In this paper,solutions is recommended after inductive analysis of the various factors affecting the plan and technical and economic comparison of the feasible plans are made to derive the conclusion.
出处
《铁道建筑技术》
2014年第8期63-64,100,共3页
Railway Construction Technology
关键词
锦赤铁路
铁路选线
方案比选
城市规划
Jinzhou-Chifeng railway railway location plan comparison city planning