1500mm热轧带钢生产线2#行车端梁改造

Transformation of End Beam of 2# Driving in 1500mm Hot-rolled Strip Production Line
下载PDF
导出
摘要 针对采用活动端梁连接的大吨位行车由于行车启(制)动冲撞导致装配尺寸的增大,端梁销轴、销孔无法正常传递拖动力,提出改造方案并实践,取得良好效果。 Aiming at the current situation that end beam pin, pin hole cant be normal transfer drag force for that the start (brake) collision of large tonnage driving connected by movable end beams led to the increasing of its assembly dimension, the reform scheme was put forward and the corresponding practice was carried out, thus the good effect was obtained.
机构地区 设备检修中心
出处 《莱钢科技》 2014年第4期50-51,共2页 Laigang Science & Technology
关键词 端梁 应力 磨损 脆性断裂 end beam stress wearing brittle fracture