摘要
本文分析了煤矿井下10KV变电所供电双回路并列运行的必要性,确定现场核相操作程序、步骤及相关注意事项,为各类供电系统相序核定提供参考。
This paper analyzes the necessity of 1OKV in coal mine underground substation supply double circuit parallel operation, deter- mine the nuclear phase operation procedures, procedures and related matters needing attention, and provides the standard for all kinds of power supply system of phase sequence.
出处
《内蒙古煤炭经济》
2014年第9期107-107,共1页
Inner Mongolia Coal Economy
关键词
井下变电所
相序核定
过程分析
The coal mine substation
Phase sequence for approval
Process analysis