摘要
杭州地铁建设过程中,地铁1、4线4条隧道先后在富水地层中近距离侧穿火车东站东广场2、3层地下室工程桩。为保护工程桩安全,在盾构侧穿期间进行了大规模的桩身钢筋应力与测斜原位监测,以控制施工参数,指导盾构施工。本文就所开展的监测内容与成果进行分析总结。
The left and right tunnels of metro line 1 and line 4 in Hangzhou pass laterally and nearlybored cast- in- place pile foundations of 2 or 3 floor basements of the Square east of Hang ZhouRailway Station East in muddy and silt stratum. While the tunnels were constructed , the monitoring ofbar stresses and lateral displacement of bored-in-place-piles were carried out to control the speed ofthe tunnel boring. This paper describes and analyzes the monitored results of bar stresses and lateraldisplacements of the piles.
出处
《科技通报》
北大核心
2014年第9期84-89,共6页
Bulletin of Science and Technology
关键词
地铁盾构
灌注桩
钢筋应力
桩侧向位移
metro tunnels
bored cast-in-place- piles
bar stress
lateral displacement