摘要 对国际热核实验反应堆(ITER)校正场线圈试验件的真空辅助树脂传递模塑(VARTM)工艺进行了模拟,分析了注射口位置、数量对充模过程的影响。结果表明,最优的注射位置在两匝导体之间;随注射口数量增加,充模时间近似呈指数衰减。对试验件实际浇注过程进行了模拟,通过流动前沿确定了溢料口位置。根据模拟的注射口和溢料口位置设计模具,进行浇注试验。计算充模时间6 290 s与实际时间6 600 s接近,试验件固化后无干斑缺陷。VARTM工艺模拟可为校正场线圈提供制造方案及工艺优化。 The numerical analysis and the experimental investigation for the mock-up of international thermonuclear experimental reactor(ITER) correction coil pieces in the vacuum assisted resin transfer molding(VARTM) process was simulated. The effects of the locations and number of gates on mold-filling process were studied. The results show that the optimized locations of gates are between the two turns. Filling time had exponential decrease with the increase of the number of gates. The locations of vents are based on the flow front of resin, and the mold is designed according to those. The actual filling time (6 600 s) is closed to the calculated time (6 290 s). There are no dry spots in the mock-up. The VARTM simulation is proved useful in strategy design and process optimization for correction coil.
出处 《工程塑料应用》 CAS CSCD 北大核心 2014年第9期49-51,共3页 Engineering Plastics Application
基金 ITER计划专项(2008GB101000) 国家自然科学基金项目(51107138)
关键词 复合材料 校正场线圈 VARTM 数值模拟 composite correction coil VARTM numerical simulation
  • 相关文献

参考文献8

  • 1Simacek P, Eksik O, Heider D, et al. Experimental validation of post-filling flow in vacuum assisted resin transfer molding processes [J]. Composites Part A: Applied Science and Manufacturing, 2012,43(3) : 370-380.
  • 2赖家美,王德盼,陈显明,王科,何建涛.工艺参数对VARTM中树脂充模流动的影响研究[J].工程塑料应用,2013,41(12):49-53. 被引量:4
  • 3DeValve C, Pitchumani R. Simulation of void formation in liquid composite molding processes[J]. Composites Part A: Applied Science and Manufacturing, 2013,51 (8) : 22-32.
  • 4Laurenzi S, Grilli A, Pinna M, et al. Process simulation for a large composite aeronautic beam by resin transfer molding[J]. Composites Part B: Engieering,2014,57(2) : 47-55.
  • 5Matsuzaki R, Kobayashi S, Todoroki A. Flow control by progressive forecasting using numerical simulation during vacuum- assisted resin transfer molding[J]. Composites Part A: Applied Science and Manufacturing,2013,45(2) : 79-87.
  • 6Poodts E, Minak G, Mazzocchetti L, et al. Fabrication, process simulation and testing of a thick CFRP component using the RTM process[J]. Composites Part B: Engineering,2014,56(1) : 673- 680.
  • 7孙玉敏,段跃新,李丹,梁志勇,张佐光.风机叶片RTM工艺模拟分析及其优化[J].复合材料学报,2005,22(4):23-29. 被引量:24
  • 8Naik N K, .Sirisha M, lnani A. Permeability characterization of polymer matrix composites by RTM/VARTM[J]. Progress in Aerospace Sciences, 2014,65(2) : 22-40.

二级参考文献20

  • 1孙赛,刘木金,王海,崔天放.RTM成型工艺及其派生工艺[J].宇航材料工艺,2010,40(6):21-23. 被引量:22
  • 2贝尔 李竟生等(译).多孔介质流体动力学[M].北京:中国建筑工业出版社,1983..
  • 3Rudd C D, Long A C, Kendall K N. Liquid Molding Technologies [M]. Cambridge: Woodhead Publishing Limited,1997. 254-292.
  • 4Brouwer W D, Herpt E C, Labordus M. Vacuum injection moulding for large structural applications[J]. Composites Part A, 2003,34(6):551-558.
  • 5Correia N C, Robitaille F, Long A C, et al. Analysis of the vacuum infusion moulding process:I.Analytical formulation[J]. Composites Part A:Applied Science and Manufacturing, 2005,36(12): 1 645- 1 656.
  • 6Vishwanath R F, Kuang-ting H. Effects of vacuum pressure, inlet pressure, and mold temperature on the void content, volume fraction of polyester / E-glass fiber composites manufactured with VARTM process[J]. Journal of Composite Materials,2011, 45(26):2 727-2 742.
  • 7孔晋峰,张彦飞,刘亚青.复合材料RTM成型工艺参数的研究[J].工程塑料应用,2009,37(4):42-44. 被引量:10
  • 8魏俊伟,张用兵,郭万涛.真空辅助成型(VARI)工艺研究进展[J].材料开发与应用,2010,25(3):99-105. 被引量:31
  • 9杨金水,肖加余,曾竟成,彭超义.真空导入模塑工艺树脂流动行为研究进展[J].宇航材料工艺,2010,40(1):5-8. 被引量:12
  • 10赵秋艳.复合材料成型工艺的发展[J].航天返回与遥感,1999,20(1):41-46. 被引量:17

共引文献26

同被引文献79

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部