框架结构梁板先于柱支模施工工艺与技术措施

Construction technology and technical measures of beam-slab before column formwork in frame structure
下载PDF
导出
摘要 以延吉市少年宫工程项目为例,介绍了采用扣件式钢管支撑架,框架结构梁板先于柱支模施工工艺流程,并提出了框架梁板柱支模、梁钢筋骨架绑扎和预制以及安装、浇筑混凝土等施工技术措施,经工程验收,其施工质量符合现行质量验评标准,缩短了建设工期、降低了工程造价。 In this paper, taking Yanji city children' s palace project as an example, introduces the fastener style steel pipe support frame, frame beam before column formwork construction process, and puts forward the technical measures for the construction of the framework slab column formwork, steel beam skeleton banding and preeast and installation, pouring concrete etc.. Through the project acceptance, the construction quality and meet the current quality assessment standards, shorten construction period and reduce the project cost.
出处 《山西建筑》 2014年第29期113-114,共2页 Shanxi Architecture
基金 延大科技发展基金资助项目(项目编号:2013-G)
关键词 梁柱支模 钢筋绑扎 梁钢筋骨架 混凝土浇筑 beam and column template support, reinforcing bar, beam reinforced skeleton, concrete casting
  • 相关文献

参考文献4

二级参考文献4

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部