摘要
对配电箱壳体与暗配管同时预埋施工的特点进行了阐述,介绍了该施工方法的适用范围及工艺流程,并分析了施工过程中应注意的操作要点,基于相关规范标准,研究了贯穿施工全过程的技术管理措施,使企业获得了良好的经济效益。
The paper describes the simultaneous embedded construction features of distribution box shell and recessed pipe, introduces its appli- cation scope and technology procedures, analyzes matters needing attention in construction process, and studies whole-process technology manage- ment measures on the basis of relevant norms, which help the enterprise achieve good economic benefits.
出处
《山西建筑》
2014年第29期154-156,共3页
Shanxi Architecture
关键词
配电箱壳体
暗配管
预埋施工
管路敷设
distribution box shell, recessed pipe, embedded construction, pipeline laying