摘要
以具体工程为例,介绍了高支模方案设计、搭设、使用、拆除等技术措施,着重对高支模方案工程成本与投标报价进行了比较分析,探讨了高大模板技术措施费用的问题,提出了一些解决建议。
Taking specific engineering as an example, the article introduces the high template scheme design, setting, utilization and demolish- ment and other technological measures, mainly compares and analyzes high template scheme engineering cost and bidding quota, and explores high template technology measures cost, and finally puts forward some solving suggestions.
出处
《山西建筑》
2014年第29期248-249,共2页
Shanxi Architecture
关键词
高大模板
费用
技术
方案
high template, cost, technology, scheme