摘要
以项目施工进度计划的编制为研究对象,从编制依据,编制步骤入手,简要分析了关键线路的施工过程项目确定方法,明确了工程量计算中需要注意的事项,并详细阐述了进度计划编制的细节,以很好地指导施工。
Taking the program construction progress planning as the research object, the paper analyzes the identifying methods for the key routine in the construction process from the compile reference and steps, clarifies the precautions in the quantity calculation, and mainly illustrates the details in the progress planning compilation, so as to direct the construction better.
出处
《山西建筑》
2014年第28期266-267,共2页
Shanxi Architecture
关键词
施工进度
关键线路
计划
过程
construction progress
key routine
plan
process