摘要
本文从总包单位项目部角度出发,从施工组织设计和相关的专项方案制订入手,探讨高层建筑转换层施工过程中的事前、事中及事后控制。理论与实践相结合地探讨高层建筑施工的过程。
This paper from the perspective of general contrac-tor project, embarks from the construction organization design and the related special discusses the control of beforehand, du-ring and afterwards in high-rise building construction convers-ion layer process. Combined theory and practice explore the process of high-rise building construction.
出处
《城市建筑》
2014年第8期139-139,共1页
Urbanism and Architecture
关键词
高层建筑
转换层
施工控制
high rise building transfer floor construction co-ntrol