摘要
本文就基础设计中的基础温度区段过长与大型混凝土浇筑问题、主楼与裙房沉降差问题以及基础抗浮等三个典型问题进行了探讨,并提出了解决措施。旨在加强高层基础设计,为广大同行提供参考与借鉴。
In this article, the author discusses three typical pr-oblems of the long base temperature section and large concrete pouring, the set lement dif erence between the main building and the podium, and basic construct and so on, and put forward the countermeasures so as to strengthen the high-rise founda-tion design and provide reference for the majority of peers.
出处
《城市建筑》
2014年第8期191-191,共1页
Urbanism and Architecture
关键词
高层建筑
基础设计
问题处理
high-rise buildings foundation design problem processing