近些年,随着工程量清单计价的广泛应用,原有造价计算模式已不能再满足现有的市场发展,这就要求在造价管理中做到“量价分离”,而工程量清单计价恰恰满足了要求。本文对这种新的造价模式进行了深入地分析。
In recent years, with the wide application of boq cost estimation, the original cost calculation model has been unable to meet the existing market development, which req-uires "separation of quantity and price" in cost management, and the boq cost estimation exactly meet the requirements. In this paper, the new cost calculation modle is analysised in-d-epth.
出处
《城市建筑》
2014年第12期209-209,共1页
Urbanism and Architecture
关键词
清单计价
量价分离
控制分析
engineering bil pricing
separation of quantity and price
control ing analysis