摘要
设置混凝土防渗墙,采用混凝土防渗墙的实施方案,与已建成的混凝土防渗墙衔接,对整个透水坝基进行“全封闭”,彻底有效解决坝基渗流控制问题。
Set ing up the concrete diaphragm wal , using the implementation scheme of the concrete diaphragm wal and linking up the built concrete diaphragm wal to complete shut-of the whole permeable dam foundation and effectively solve the problem of dam foundation seepage control completely.
出处
《城市建筑》
2014年第12期360-360,共1页
Urbanism and Architecture
关键词
渗透
稳定
防渗
permeate
stable
seepage control