期刊文献+

基于滚动规划的泊位和岸桥分配集成模型研究 被引量:1

Study for rolling based berth and quay crane allocation model
下载PDF
导出
摘要 泊位分配(BA),岸桥配置(QCA)及岸桥调度(QCS)是三个基本的岸边决策问题。提出了一个基于混合整数线性规划的BA和QCA的集成模型,模型综合考虑了货轮优先权,理想泊位及处理时间三个方面的因素。在实际生产数据上的运行结果表明该模型具有决策支持的潜在能力。 Berth Allocation(BA), Quay Crane Assignment(QCA)and Quay Crane Schedule(QCS)are three basic decision problems about seaboard. A Mixed Integer Linear Program(MILP)based integrated model of BA and QCA is presented. This model takes into acount the vessel priorities, preferred berthing locations and handling time consideration. The exper-iment result on the practical data shows that this model has the potential to support the operation and decision-making.
作者 白治江 黄卿
出处 《计算机工程与应用》 CSCD 2014年第18期265-270,共6页 Computer Engineering and Applications
基金 上海海事大学科研基金项目(No.20100090)
关键词 泊位和岸桥分配 集成模型 混合整数线性规划 滚动规划 berth and quay crane allocation integrated model mixed integer linear programming rolling horizon plan
  • 相关文献

参考文献15

  • 1Stahlbock R,Vop S.Operations research at container ter- minals : a literature update[J].OR Spectrum, 2008,30 : 1-52.
  • 2Bierwirth C,Meisel F.A survey of berth allocation and quay crane scheduling problems in container terminals[J]. European Journal of Operational Research, 2009, 202: 615 -627.
  • 3Lai K K, Shih K.A study of container berth allocation[J]. Journal of Advanced Transportation, 1992,26 : 45-60.
  • 4Legato P,Mazza R M.Berth planning and resources opti- mization at a container terminal via discrete event simu- lation[J].European Journal of Operational Research,2001, 133 : 537-547.
  • 5Imai A, Nishirnura E, Papadimitriou S.Berth allocationwith service priority[J].Transportation Research Part B, 2003,37:437-457.
  • 6Lokuge P, Alahakoon D.Improving the adaptability in automated vessel scheduling in container ports using intel- ligent software agents[J].European Journal of Operational Research, 2007,177: 1985-2015.
  • 7Moorthy R,Teo C.Berth management in container terminal: the template design problem[J].OR Spectrum,2006,28: 495-518.
  • 8Park Y M, Kim K H.A scheduling method for berth and quay eranes[J].OR Spectrum,2003,25:1-23.
  • 9Liu J,Wan Y W,Wang L.Quay crane scheduling at con- tainer terminals to minimize the maximum relative tardi- ness of vessel departures[J].Naval Research Logistics,2006, 53 : 60-74.
  • 10de Oliveira R M.Clustering search for the berth alloca- tion problem[J].Expert Systems with Applications,2012,39:5499-5505.

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部