某高耸进水塔地基处理方案优选 被引量:2

Scheme Optimization of Foundation Treatment for High-rise Intake Tower
下载PDF
导出
摘要 针对新疆地区某水电站高耸进水塔地基不能满足上部结构要求的问题,采用PKPM软件中桩筏有限元计算模块和ADINA有限元软件,对高耸进水塔三种地基处理方案进行了计算分析。结果表明,桩基础、深齿墙+桩基础、无桩深齿墙三种方案均满足上部结构承载的要求;通过对比三种方案五个工况下的最大沉降量、应力及安全性等,并结合该高耸进水塔的项目特点,最终推荐选择无桩深齿墙方案。 Aiming at the problem that high-rise intake tower foundation cannot meet the upper structure demands of a hydroelectric station in Xinjiang, analysis of the foundation treatment of a certain high-rise intake tower was conducted by using PKPM and ADINA finite element software. The calculation results indicate that all of three schemes (pile foundation, deep key wall combined with pile foundation, deep key wall without pile) can meet the design requirements of upper structure; comparison of maximum settlement, stress and safety under five different working conditions for three schemes was done. Finally, the scheme of deep key wall without pile was recommended considering the own characteristics of high-rise intake tower.
出处 《水电能源科学》 北大核心 2014年第8期116-119,共4页 Water Resources and Power
基金 国家自然科学基金项目(51279171)
关键词 进水塔 高耸 地基处理 方案优选 桩基础 intake tower high-rise foundation treatment scheme optimization pile foundation
  • 相关文献

参考文献5

  • 1中国建筑科学研究院.建筑桩基技术规范(JGJ94-2008)[S].北京:中国建筑工业出版社,2008.
  • 2中国建筑科学研究院.建筑地基基础设计规范(GB50007-2011)[S].北京:中国建筑工业出版社,2011.
  • 3吴盛.百色水利枢纽水电站进水塔基础应力分析[J].人民珠江,2006(B02):23-24. 被引量:1
  • 4水利部长江水利委员会长江勘测规划设计研究院.水利水电工程进水口设计规范(SL285-2003)[S].北京:中国水利水电出版社,1998.
  • 5中国水利水电科学研究院,电力工业部昆明勘测设计研究院,电力工业部西北勘测设计研究院,等.水工建筑物抗震设计规范(SL203-97)[S].北京:中国水利水电出版社,1998.

二级参考文献2

  • 1广西水利电力勘测设计研究院,水利部珠江水利委员会勘测设计研究院.右江百色水利枢纽初步设计报告(2001年重编版)(3):工程地质[R],2001;73.
  • 2河海大学.百色水利枢纽电站工程进水口边坡及进水塔静、动力稳定计算研究报告[R].2002:17~26.

共引文献6

同被引文献12

引证文献2

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部