摘要
本文主要阐述了湖北省武汉至监利高速公路洪湖至监利段吹填砂路基的设计,进一步探讨了吹填砂路基的施工工艺。
This article mainly elaborates the design of the monitoring period of blowing sand fil ing roadbed from Hon-ghu to Jianli section in Wujian highway of Hubei province, and further discusses the blown sand fil ing roadbed construction technology.
出处
《城市建筑》
2014年第15期311-311,共1页
Urbanism and Architecture
关键词
吹填砂路基
设计
施工
blowing sand fil ing roadbed
design
construction