摘要
营口港仙人岛港区2#原油码头钢栈桥工程上部结构为钢管混凝土系杆拱桥,采用在岸边陆地支架将钢栈桥拼接成整体,然后整体滑移,再利用起重船整体吊装就位,总结整桥滑移技术,为后续同类工程提供借鉴意义。
The upper structure of 2# crude oil wharf steel trestle engineering in the port of Yinkou Xianren island port is the steel pipe concrete arc bridge, and use the shore stent steel trestle joining together into a whole on the bank, then make the overal slip, and reuse the floating crane hoisting in place. This article summary the whole bridge slips technology to provide reference value for subsequent similar projects.
出处
《城市建筑》
2014年第15期350-350,394,共2页
Urbanism and Architecture
关键词
整桥滑移
滑道滑动
液压牵引装置
whole bridge slip
slide way
hydraulic traction device