摘要
引江济汉工程为南水北调中线一期工程汉江中下游四项治理工程之一。为了保证泵站流道钢衬底部混凝土浇筑的施工质量,本工程在混凝土浇筑中进行了多方面的方案优化。
Lead the ChangJiang water to Hanjiang project is one of the four management projects of the middle route of first phase south-to-north water transfer project in the middle and lower reaches of Hanjiang River. In order to guarantee the construction quality of concrete pouring under the bot om of pumping station flow channel steel liner, the project carries on various scheme optimizations in the concrete pouring.
出处
《城市建筑》
2014年第4期72-72,共1页
Urbanism and Architecture
关键词
泵站流道
钢衬混凝土
施工
pump station flow channel
steel liner concrete
c-onstruction