本文结合合福铁路闽清站1#大桥4×32 m道岔连续梁施工,重点对铁路车站道岔连续梁现浇支架体系设计与施工、道岔连续梁施工工艺等方面进行了阐述,希望对类似工程施工具有借鉴和参考价值。
This article bases on the 1 # 4× 32 m rail continu-ous beam bridge construction of Hefu railway Minqing station and carries on the elaboration of the aspects of the cast-in-pl-ace continuous beam support system design and construction of railway station switch, the switch continuous beam construction technology, etc, and hope to provide reference value for similar projects.