期刊文献+

浅谈预制混凝土箱梁冬季养生 被引量:1

Discuss the Precast Concrete Box Girder Keeping in Good Health in winter
下载PDF
导出
摘要 本文以常嘉高速澄湖特大桥预制箱梁冬季施工为例,介绍了采用电加热蒸汽发生器供热结合暖棚蓄热的方法,进行预制混凝土箱梁的养生工艺。该法养护施工的箱梁外观无裂纹,混凝土强度形成快速、稳定,确保了工期的进度,预制效果良好。 This article takes the winter construction of precast concrete box girders of Cheng Hute Bridge in Changjia expre-ssway as an example and introduces the health maintenance process of precast concrete box girder by using the electric he-ating steam generator to supply heat combines with greenhous-es heat storage method. This box girder appearance of health maintenance technology has no crack with fast and stable stre-ngthen concrete so as to ensure the construction progress and good prefabricated effect.
作者 张瑜 唐春刚
出处 《城市建筑》 2014年第6期270-270,共1页 Urbanism and Architecture
关键词 预制箱梁 蒸汽供热 暖棚蓄热 precast box girder steam heating greenhouses h-eat storage
  • 相关文献

参考文献4

二级参考文献20

  • 1吕兴伟.超大体积混凝土温度应力与裂缝的控制[J].工业建筑,2008,38(z1):842-844. 被引量:1
  • 2温锁林,侯育华.大跨度现浇箱梁蒸汽养护技术[J].中国市政工程,2004(5):35-36. 被引量:6
  • 3TZ201-2005,铁路混凝土工程施工技术指南[S].
  • 4王培民.新型和特种混凝土配合比设计及施工性能检测实用手册[K].北京:中国建材工业出版社,2004.
  • 5秦文强.混凝土减水剂与泵送剂配方设计、生产应用新工艺新技术及混凝土裂渗防治技术实用手册[K].北京:北方工业出版社,2007.
  • 6JTJ041—2000.公路桥涵施工技术规范[S].[S].,..
  • 7TZ213-2005,客运专线铁路桥涵工程施工技术指南[S].
  • 8铁建设[2005]160号,客运专线铁路桥涵工程施工质量验收暂行标准[S].
  • 9JTJ 041-2000.公路桥涵施工技术规范[S],2000.
  • 10张岗,贺拴海,宋一凡.混凝土箱梁水化热温度损伤修正耦合方法[J].交通运输工程学报,2008,8(1):54-60. 被引量:20

共引文献18

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部