摘要
本文从编制结算文件要求、竣工图等资料、做到计价依据清楚、完整及全面掌握工程各个阶段的造价情况等几方面,探讨了造价人员如何做好工程结算工作。
This article discusses the cost staff how to do a good job of project setlementfrom several aspects of the do-cuments requirements of setlement, as-constructed drawings, do the clear of valuation, complete and comprehensive grasp the situation at various stages of project cost and so on.
出处
《城市建筑》
2014年第9期209-209,共1页
Urbanism and Architecture
关键词
工程
造价人员
结算工作
engineering
cost personnel
clearing work