摘要
施工进度计划控制贯穿于整个水利水电施工项目施工过程。因此,如何进行有效可行的进度计划控制就显得非常重要。本文针对水利水电工程施工进度计划的控制,对其进行了一些探讨。
The construction schedule control throughout the whole project construction process of water conservancy and hydropower construction. Therefore, how to carry out effective feasible schedule control is very important. This article bases on the control of water resources and hydropower engineering construction schedule and discusses some of them.
出处
《城市建筑》
2014年第9期360-360,375,共2页
Urbanism and Architecture
关键词
水利工程
进度计划
控制
water conservancy project
schedule
control