摘要
本文回顾了湄洲湾至重庆高速公路福建境三明(莘口)至明溪(城关)段两阶段设计过程,重点针对影响路线方案的不良地质现象进行分析。
This article reviewed the Meizhou bay to Chongq-ing highway in fujian sanming (xinkou) to MingXi (chengguan) period of two stage design process, analyzing that focus on bad geological phenomenon which influence route scheme.
出处
《城市建筑》
2014年第11期333-334,共2页
Urbanism and Architecture
关键词
山区高速公路
地质选线
mountainous highway
line selection