6Ronhan A,Goyet J,Faber M H,2004.Industrial implementation of risk based inspection planning methods.Lessons learnt from experience(2)The case of steel offshore struetures.In Proceeding of the 23rd International Conference on Offshore Mechanics and Arctic Engineering,no OMAE2004/S&R-51573.
7Lanquetin B,TOTAL S A.Floating Units Integrity Management and Life Cycle Enhancement.Offshore Europe 2005 Conference,Aberdeen,6-9 September 2005.
8M H Faber,S Engelund,J D Sorensen and A Bloch.Simplified and Genetic Risk Based Inspection planning.OMAE 2000,S&R paper 6143.New Orleans,USA,
9J Goyet,D Straub and M H Faber.Risk Based inspection planning of offshore installations.Structural Engineering International,Volume 12,number 3,August 2002.
10M Faber.Risk Based Inspection:The framework.Structural Engineering International,Volume 12,number 3,August 2002.