摘要
对华能汕头电厂重件码头改造工程燃煤接卸系统的工艺设计进行了分析,在场地受限、功能众多的情况下,通过科学、合理地布置并考虑地形特点,实现了各项功能需求,使各环节能力相匹配,对于以后类似工程码头的改造设计提供了经验借鉴。
The paper analyzes the process design of coal handling system of the heavy-lift wharf modification works in Huaneng Shantou Power Plant,to realize the demands of each function through scientific and reasonable arrangement and consideration of the landform characteristics under the condition of limited site and various functions,so that all the links can match with each other,providing experiential guidance for reformation design of similar engineering wharf in the fu-ture.
出处
《起重运输机械》
2014年第9期111-114,共4页
Hoisting and Conveying Machinery
关键词
码头改造
自卸船
固定式漏斗
实物校验装置
圆振筛
wharf transformation self-unloading ship fixed funnel material verifying unit circular screen