期刊文献+

王坡井田煤层气井部署方法研究 被引量:2

Study on CBM Well Deployment in Wangpo Minefield
下载PDF
导出
摘要 王坡煤矿是高瓦斯矿井,已有的井下瓦斯抽排不能满足矿井安全生产的要求,迫切需要通过地面抽采来缓解。在已有地质成果基础上,采用煤层气藏数值模拟方法,对王坡井田地面煤层气抽采工程部署方案进行优化。结果表明:A区块是井田煤层气开发试验首选区,以梅花形井网作为试验井网,井间距300m×250m,井网长轴方向60°。这种布井方式在工程实践中取得了较好效果,具有较大的推广价值。 The Wangpo coalmine is a gassy mine. Existing underground gas drainage could not satisfy requirements of mine safety in production, thus surface CBM drainage is urgently needed. On the basis of available geological data, using CBM reservoir simulation method optimized surface CBM drainage engineering deployment scheme. The result has demonstrated that the block A is minefield CBM exploitation test preferred area, taking the quincunxial well pattern as the testing pattern, with well spacing 300m×250m, orientation 60°. This well pattern has been achieved good results in project practices, thus worth of spreading.
出处 《中国煤炭地质》 2014年第9期24-26,30,共4页 Coal Geology of China
基金 国家科技重大专项课题(2011ZX05040-005) 中煤科工集团西安研究院有限公司青年基金项目(2013XAY-QN015)
关键词 工程优化 数值模拟 试验工程 煤层气 王坡井田 project optimization numerical simulation testing project CBM Wangpo minefield
  • 相关文献

参考文献6

二级参考文献36

共引文献45

同被引文献7

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部