7BASHEIN B,MARKUSL,RILEYP.Precondition for BPR Success[J].Information System Management,1994,11(2):7-l3.
8Madhavan T,Paul T.Business Process Redesign in Enterprise Systems Projects:Radical and Evolutionary Change[C].Proceedings of the Eleventh American Conference on Information System,2005:2167-2173.
9Housel T, Bell A, Kanevsky V. Calculating the value of reengineering at pacific bell[J]. Planning Review, 1994(1-2): 40-43, 55.