摘要 根据智能变电站二次设备预制舱标准化设计、工厂化加工、装配式组装等理念,结合国家电网公司110-A3-3通用设计方案,通过对二次设备的优化整合,在满足IEC 61850功能自由分配理念的同时,提出网络化备自投、测控装置与计量的整合,取消独立故障录波器,进行站控设备的整合等优化方案,合理压缩二次设备数量,更加有效地利用了预制舱内的空间。 On the basis of concepts such as design standardization, factory processing and assembly compos- ing of prefabricated cabin for secondary equipment in intelligent substation, the paper, in combination with the general design scheme of 110-A3-3 published by State Grid Company and through the optimization and integration of the secondary equipment, proposes to meet IEC 61850 function free allocation idea; in the meantime, it suggests reducing the number of secondary equipment reasonably and using the inner space of the prefabricated cabin more effectively.
出处 《浙江电力》 2014年第9期19-21,共3页 Zhejiang Electric Power
关键词 预制舱 二次设备 智能变电站 优化 prefabricated cabin secondary equipment intelligent substation optimization
  • 相关文献

参考文献1

  • 1刘振亚.国家电网公司输变电工程通用设计110-750kV智能变电站部分[M].北京:中国电力出版社,2011.

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部