大跨径悬索桥施工阶段颤振稳定性影响因素研究 被引量:6

Research on flutter stability of a long-span suspension bridge during erection
下载PDF
导出
摘要 基于全物理坐标法的ANSYS有限元模型,对中渡桥施工阶段颤振稳定性进行分析,分别研究对称与不对称施工、不同初始风攻角、结构阻尼等因素对施工阶段颤振稳定性的影响。研究结果表明:不对称施工顺序更有利于施工阶段的颤振稳定性;初始风攻角为-3°时有利于颤振稳定性,而+3°时最为不利;结构阻尼对颤振稳定性影响较大,特别是早期施工阶段尤为显著,可明显改善大跨度悬索桥施工阶段颤振稳定性。分析方法可为桥梁设计和研究人员提供参考。 The characteristics of flutter stability during construction are influenced by many factors such as the sequence of deck erection.In this paper,numerical flutter stability analyses were performed for the construction process of the Zhongdu Bridge over Yangtze River with ANSYS FE model based on physical coordinates method. Therein,the effect of structural damping,the initial wind attack angle,and the sequence of deck erection were discussed in detail.It is found that the non-symmetrical sequence deck erection is aerodynamically favourable for the deck erection for long-span suspension bridges.As for the initial wind attack angle,it is beneficial to flutter stability with -3°,while unfavorable with +3°.Meanwhile,structural damping has a great impact on flutter stability,particularly obvious during the early construction stage.This analysis method with ANSYS could afford reference to bridge designers.
出处 《铁道科学与工程学报》 CAS CSCD 北大核心 2014年第5期5-11,共7页 Journal of Railway Science and Engineering
基金 同济大学土木工程防灾国家重点实验室开发基金资助项目(KLWRTBMC) 国家自然科学基金资助项目(51278069 51208067) 湖南省教育厅优秀青年项目资助(12B009) 铁四院科研项目资助
关键词 大跨径悬索桥 颤振稳定性 施工阶段 ANSYS模型 long-span suspension bridge flutter stability construction phase ANSYS model
  • 相关文献

参考文献18

  • 1TanakaH,DamsgaardA,ReinoP,etal.Aerodynamicstabilityofasuspensionbridgewithapartiallyconstructedbridgedeck[C]//Proc15thIntAssn(association)ofBridgeandStructEngrsCongrRep,IABSE,Zurich,1996:113-118.
  • 2TanakaH,GimsingNJ.Aerodynamicstabilityofnonsymmetricallyerectedsuspension bridgegirders[J].JournalofWindEngineeringandIndustrialAerodynamic,1999,80:85-104.
  • 3GeYJ,TanakaH.Aerodynamicstabilityoflong-spansuspensionbridgesundererection[J].JournalofStructureEngineering,ASCE,2000,126(12):1404-1412.
  • 4CobodelArcoD,AparicioAC.Improvingthewindstabilityofsuspensionbridgesduringconstruction[J].JournalofStructureEngineering,ASCE,2001,127(8):869-875.
  • 5LarsenA.Predictionofaeroelasticstabilityofsuspensionbridgesduringerection[C]//TheProceedingof9thInternationalConferenceonWindEngineering,NewDelhi,India,1995.
  • 6LarsenA.Aerodynamicaspectsofthefinaldesignofthe1624msuspensionbridgeacrosstheGreatBelt[J].JournalofWindEngineeringandIndustrialAerodynamic,1993,48:261-285.
  • 7郑宪政,奚绍中.悬索桥加劲梁架设过程抗风稳定性分析[J].桥梁建设,1997,27(1):24-28. 被引量:3
  • 8张新军,陈艾荣,项海帆.大跨度悬索桥施工阶段颤振稳定性研究[J].公路,2001,46(10):60-63. 被引量:2
  • 9ZhangXJ.Investigationonaerodynamicstabilityoflong-spansuspensionbridgesundererection[J].JournalofWind Engineering and IndustrialAerodynamic, 2004(92):1-8.
  • 10刘竹钊,何宪飞,陈艾荣.大跨悬索桥施工过程颤振稳定分析[J].同济大学学报(自然科学版),2002,30(5):563-568. 被引量:10

二级参考文献55

共引文献43

同被引文献81

引证文献6

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部