摘要
露天采矿工艺中,采煤工艺采用电铲-自移式破碎工艺在露天煤矿应用不多,还处于试验阶段,它的适用条件比较苛刻,一般要求水平煤层。白音华二号露天矿煤层有一定的倾角,在应用这套系统就会存在电铲向自移式破碎机装载物料时,出现电铲卸载高度满足不了自移式破碎机要求的高度的现象,针对此问题,结合现场及设备实际,从生产工艺方面提出了解决方案。
In the open-pit mining process, adopting shovel self-moving type crushing process not too much in open-pit coal mine coal mining technology, which is in the test phase. The applicable conditions of technology are harsh and general requirements of technology are in horizontal coal seams. Coal seam in Baiyinhua No.2 open-pit mine has a certain angle of inclination, and shovel dumping height doesn't meet self-moving type crusher high requirement in loading materials. Aiming at this matter and combining the field and actual equipment, the article presents solution scheme from production technology aspect.
出处
《露天采矿技术》
CAS
2014年第9期15-17,共3页
Opencast Mining Technology
关键词
采煤半连续
搭接
卸载高度
电铲
semi-continuous mining
lap
unloading height
shovel