铁路建设总承包工程投资控制与管理 被引量:3

Railway Construction General Contracting Engineering Investment Control and Management
下载PDF
导出
摘要 铁路建设总承包工程是一项复杂的系统工程,涉及到设计、物资采购、施工及管理等方方面面。如何在项目的实施中做好投资控制与管理,此文针对工程建设的投标报价、工程实施及竣工结(决)算3个阶段易出现的问题进行分析。通过分析与研究,提出总承包工程在3个阶段进行投资控制和管理的措施与建议。 Railway construction general contracting project is a complicated system engineering, involving the design, procurement, construction, management and other aspects. Aiming at the problems appear in the three stages that the bid price, project implementation and completion final accounts of the project con struction are analyzed. Through the analysis and study, the investment control and management measures and suggestions in the three stages of the general contracting project are put forward, to provide reference for the similar projects.
作者 高赟
出处 《铁路工程造价管理》 2014年第5期31-33,共3页 Railway Engineering Cost Management
关键词 铁路工程 总承包 投资管理 控制 Railway engineering General contracting Investment management Control
  • 相关文献

参考文献3

  • 1TB 10504-2007,铁路建设项目预可行性研究、可行性研究和设计文件编制办法[S].
  • 2铁建设[2006]113号,铁路基本建设工程设计概(预)算编制办法[S].
  • 3尹贻林.工程造价管理基础理论与相关法规[M].北京:中国计划出版社.2010.

共引文献24

同被引文献11

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部