摘要
In this statistics,the wind turbine installations completed in the period from January 1^(st),2013 to December 31^(st),2013 are added,before grid connection and commissioning.The information from wind turbine manufacturers has been cross-checked with wind farm developers and project managers,whose contributions are appreciated.
In this statistics, the wind turbine installations completed in the period from lanuary 1st 2013 to December 31st 2013 are added, before grid connection and commissioning. The information from wind turbine manufacturers has been cross-checked with wind farm developers and project managers, whose contributions are appreciated.