摘要
结合建筑工程施工进度管理的现状,对影响建筑工程施工进度的因素进行了分析,提出了加大组织力度、鼓励技术先行、完善管理制度、确保物资供应等建筑工程进度管理的措施,以如期实现进度目标,提高经济效益。
Combining with building engineering construction schedule management status, analyzes factors influencing building engineering con- struction schedule, and puts forward building engineering schedule management measures, such as strengthening organization, encourage technology priority, improve management system and ensure material supply and so on, with a view to realize the schedule target and improve economic benefit.
出处
《山西建筑》
2014年第30期281-282,共2页
Shanxi Architecture
关键词
建筑工程
进度管理
施工
因素
building engineering, schedule management, construction, factor