期刊文献+

某地铁区间盾构法施工监测分析 被引量:5

Monitoring analysis of subway interval shield method construction
下载PDF
导出
摘要 地铁区间盾构法施工监测是确保地铁区间施工安全的重要保障。在分析盾构隧道施工地表建(构)筑物沉降监测、建(构)筑物倾斜监测、裂缝监测、隧道管片隆沉监测、隧道管片水平收敛监测等监测内容、监测方法、监测频率及控制标准的基础上,结合某地铁区间盾构法施工监测工程实践,分析所获得的横向地表沉降、隧道管片沉降或隆起、净空水平收敛监测的结果,得到相应横向地表沉降、纵向地表沉降和沉降过程的规律,以及隧道管片沉降或隆起、净空水平收敛监测变形规律。 Metro shield method construction monitoring is the importance of safety guarantee to ensure the metro construction. Analysis is made on the shield tunnel construction on the surface of building (structure) settling monitoring, building (structure) tilt, crack monitoring, tunnel segment lung sink monitoring, tunnel segment level convergence monitoring based on monitoring content, monitoring methods,monitoring frequency and control standard. Combined with monitoring engineering practice of a metro shield method construction, analysis is made on the obtained lateral surface subsidence, and tunnel segment settlement or uplift, clearance level convergence monitoring results. The corresponding transverse, longitudinal surface subsidence of the ground surface settlement and settlement process rules and tunnel segment settlement or uplift, clearance level convergence monitoring deformation are obtained.
作者 曹占虎
出处 《测绘工程》 CSCD 2014年第9期70-73,共4页 Engineering of Surveying and Mapping
关键词 地铁 盾构法 施工监测 subway shield method construction monitoring
  • 相关文献

参考文献7

二级参考文献28

  • 1[2]Itasca Consulting Group,Inc.Theory and Background[M].2002.
  • 2Peck R B. Deep excavations and tunnelling in soft ground[A]. In:Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering[C]. Mexico City:Sociedad Mexicana de Mecanica de Suelos,A. C,1969. 225-290.
  • 3Mair R J,Taylor R N. Bored tunnelling in the urban environment[A]. In:Proceedings of 14th International Conference on Soil Mechanics and Foundation Engineering(Vol.4)[C]. Hamburg:Balkema,1997. 2 353-2 385.
  • 4Lee K M,Rowe R K. Finite element modeling of the three dimensional ground deformations due to tunneling in soft cohesive soils:part I-methods of analysis[J]. Computers and Geotechnics,1990,2(2):87-110.
  • 5Lee K M,Rowe R K. Finite element modeling of the three dimensional ground deformations due to tunneling in soft cohesive soils:part II-results[J]. Computers and Geotechnics,1990,2(2):111-138.
  • 6Lee K M,Rowe R K,Lo K Y. Subsidence owing to tunnelling. I. estimating the gap parameter[J]. Canadian Geotechnical Journal,1992,29(1):929-940.
  • 7Lee K M,Rowe R K,Lo K Y. Subsidence owing to tunnelling. Ⅱ. evaluation of a prediction technique[J]. Canadian Geotechnical Journal,1992,29(1):941-953.
  • 8Komiya K,Soga K,Akagi H,et al. Finite element modelling of excavation and advancement process of a shield tunneling machine[J]. Soils and Foundations. 1999,39(3):37-52.
  • 9Lin D G,Tseng C T,Phienwej N,et al. 3D deformation analysis of earth pressure balance shield tunnelling in Bangkok subsoil[J]. Journal of the Southeast Asian Geotechnical Society,2002,(1):13-27.
  • 10刘宝琛 林德璋.浅部隧道开挖引起的地表移动和变形[J].地下空间,1983,(7):1-7.

共引文献235

同被引文献26

引证文献5

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部