CFB锅炉冷态试验与燃烧初调整

The Cold Test and the Beginning of Combustion Adjustment of CFB Boiler
下载PDF
导出
摘要 电站锅炉机组调试是确保锅炉长周期安全高效运行的重要环节。以博茨瓦纳Morupule B电站1号锅炉机组为研究对象,通过对首次冷态试验数据分析,研究了布风板和料层阻力特性,确定了临界流化风量;通过对首次燃烧初调整试验数据分析,确定了一、二次风量、含氧量和排烟温度等的控制方法,研究了锅炉受热面的汽温特性。研究结果可为同容量CFB锅炉机组的优化设计和运行提供借鉴和参考。 The unit commissioning of utility boiler is an important step to ensure the safety and efficiency of longperiod operation. Taking the No. 1 boiler unit of Botswana Morupule B power plant as the research object andthrough the analysis of the first cold test data, the characteristics of air distribution plate and bed resistance werestudied and the critical fluidization was determined. By analyzing the data of the first combustion adjustment test,the control method of primary air flow, secondary air flow, oxygen content and exhaust gas temperature were identi-fied. Then, the characteristics of the steam temperature on the boiler heating surfaces were studied. These resultscan provide reference for the design and optimization of CFB boiler units with the same capacity.
出处 《电力科学与工程》 2014年第9期7-14,共8页 Electric Power Science and Engineering
基金 河北省科学技术研究与发展计划项目(11213941)
关键词 调试 冷态试验 燃烧初调整 汽温特性 CFB commissioning the cold test the beginning of combustion adjustment steam temperaturecharacteristics
  • 相关文献

参考文献11

二级参考文献27

共引文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部