摘要
介绍了核电厂空气净化机组的功能组成;说明了空气净化机组出厂试验和现场试验的内容;给出了各项试验的测点布置方式和数量;详细分析了各试验在操作过程中应注意避免的系统性误差项;明确了在电厂运行期间,各项在役试验的操作频率。
The functions, tests made before delivery and at site, testing points and numbers, the systematic errors to be avoided during tests, and tests frequencies during operations were explained for clean air handling unit of nuclear power plant.