Establishment and Analysis of the Fault Tree for the Oil Transfer Pump System in CNPC Work Zone

Establishment and Analysis of the Fault Tree for the Oil Transfer Pump System in CNPC Work Zone
原文传递
导出
摘要 The reliability of the equipment is very important for the large petrochemical industry, especially for oil pump as the core component of driving equipment. In order to reduce the loss of the enterprise brought by equipment failure, it is need to find those reasons which may lead to equipment failure and take some preventive measures as early as possible. This article analyzes the failure of the oil transfer pump system in CNPC work zone systematically, qualitatively and quantitatively, using the fault tree analysis method. Then 105 groups of minimal cut sets are found, and the probability of system failure after a certain time operation is calculated by using Weibull distribution. Combined with specific requirements of reliability, the work zone may make a scientific decision of plant maintenance cycle according to the conclusion. The reliability of the equipment is very important for the large petrochemical industry, especially for oil pump as the core component of driving equipment. In order to reduce the loss of the enterprise brought by equipment failure, it is need to find those reasons which may lead to equipment failure and take some preventive measures as early as possible. This article analyzes the failure of the oil transfer pump system in CNPC work zone systematically, qualitatively and quantitatively, using the fault tree analysis method. Then 105 groups of minimal cut sets are found, and the probability of system failure after a certain time operation is calculated by using Weibull distribution. Combined with specific requirements of reliability, the work zone may make a scientific decision of plant maintenance cycle according to the conclusion.
出处 《International Journal of Plant Engineering and Management》 2014年第3期150-172,共23页 国际设备工程与管理(英文版)
基金 supported by The Ministry of Education of Humanities Social Science Project (NO.11YJC630071) The National Social Science Fund Project (NO.13BGL064)
关键词 fault tree reliability Weibull distribution plant maintain and management fault tree reliability Weibull distribution plant maintain and management
  • 相关文献

参考文献6

二级参考文献21

  • 1毛昭勇,宋保维,李正,胡海豹.基于遗传算法的最大似然参数优化估计[J].机械强度,2006,28(1):79-82. 被引量:21
  • 2陆山,吕鸿雁.小子样零构件可靠寿命零故障试验评估方法[J].机械强度,2006,28(3):411-414. 被引量:9
  • 3池洁.设备使用过程中的故障分布及可靠度变化分析[J].重庆建筑大学学报,2006,28(5):51-54. 被引量:9
  • 4[日]综合安全工程研究所.故障树分析 (FTA)-安全工程学[M].北京:机械工业出版社,1989.
  • 5[1]P.Liu,Foundation of reliability engineering.Beijing: Computation and Measure Press of China,1995
  • 6[2]Z.W.He,Primary research on the fault auto-diagnosis system for VRSDE.Master Thesis of Xi'an University of Technology,2001
  • 7[3]M.Savsar,Reliability analysis of a flexible manufacturing cell.Reliability Engineering and System Safety,Vol.67,pp.147~152,2000
  • 8Lloyd, David K. , and Lipow Myron, Reliability: Management, Methods, and Mathematics, Prentice Hall, Englewood Cliffs, New Jersey, 1962.
  • 9Nelson, Wayne, Applied Life Data Analysis, John Wiley & Sons, Inc. , New York, 1982.
  • 10金国梁,可靠性与优化及其在石油工业中的应用,1992年

共引文献101

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部