摘要 Reliability and maintainability of mining industry is more in focus than ever, and the mining systems are becoming more complex and the equipment more expensive to repair or modify. Unplanned failures can result in significant costs, especially when the machinery is hard to repair or spare parts are far away. This paper presents a case study describing a reliability and maintainability analysis of the main conveyor system of the Svea Coal Mine located in Svalbard, Norway. The conveyor system includes several separate conveyors. In this study, the main six conveyors of the whole system were selected for the analysis. The failure and repair data of the conveyors were collected for the whole year of 2010 using maintenance and daily reports. The date was analyzed and the result shows that the availability of six conveyers is 96.44%for one year of operation. However, reliability of these conveyers needs to be improved in order to reduce the number of failures. Reliability and maintainability of mining industry is more in focus than ever, and the mining systems are becoming more complex and the equipment more expensive to repair or modify. Unplanned failures can result in significant costs, especially when the machinery is hard to repair or spare parts are far away. This paper presents a case study describing a reliability and maintainability analysis of the main conveyor system of the Svea Coal Mine located in Svalbard, Norway. The conveyor system includes several separate conveyors. In this study, the main six conveyors of the whole system were selected for the analysis. The failure and repair data of the conveyors were collected for the whole year of 2010 using maintenance and daily reports. The date was analyzed and the result shows that the availability of six conveyers is 96.44% for one year of operation. However, reliability of these conveyers needs to be improved in order to reduce the number of failures.
出处 《International Journal of Mining Science and Technology》 2014年第5期587-591,共5页 矿业科学技术学报(英文版)
  • 相关文献

参考文献3

二级参考文献8

  • 1InfoMine. lnfoMine USA Inc[M].Mine and mill equipment cost estimator guide,2012.
  • 2Lanz T,Noakes M. Cost estimation handbook for the Australian mining industry[M].Parkville:Australasian Institute of Mining and Metallurgy,1993.
  • 3Cox EA. Equipment economics handbook of heavy construction[M].{H}New York:McGraw-Hill,1971.
  • 4Gokhale BV. Rotary drilling and blasting in large surface mines[M].Boca Raton:CRC Press-Balkema,2011.163-207.
  • 5Jimeno CL,Jimeno EL,Carcedo FJA. Drilling and blasting of rocl[M].Rotterdam:A.A.Balkema,1995.48-52.
  • 6Dihillon BS. Maintainability,maintenance,and reliability for engineers[M].Boca Raton:crc Press,2006.10-38.
  • 7KNIGHTS Peter.Integration of real options into short-term mine planning and production scheduling[J].Mining Science and Technology,2009,19(5):674-678. 被引量:2
  • 8GU Qinghua,LU Caiwu,GUO Jinping,JING Shigun.Dynamic management system of ore blending in an open pit mine based on GIS/GPS/GPRS[J].Mining Science and Technology,2010,20(1):132-137. 被引量:19