既有路基两侧帮宽施工因受到各种不确定因素的影响,常导致路基无法正常排水。根据实际施工经验,提出了对路基无法排水的处理方案。
Both sides of subgrade construction due to be affected by a wide variety of uncertain factors, often leads to the roadbed can't drain properly. According to the actual construction experience, can't be made on the roadbed drainage treatment program.
出处
《科技与创新》
2014年第17期71-72,共2页
Science and Technology & Innovation
关键词
路基
排水沟
工后沉降
泄水孔
roadbed
drains
settlement after
scuppers