摘要
机场道口对接不停航施工由于须与正在运行的跑道连接,具有组织难度大、风险高、要求严等特性,探索总结上海浦东、虹桥机场扩建道口对接不停航施工的多项方案优化和创新措施,对民航后续机场改扩建道口对接工程施工具有重要的借鉴与指导意义。
Non-suspend air construction of crossing-docking must be docked with runways in use, which endows the project with such properties as difficult organization, great risk and strict request. Exploring and summarizing some project optimizations and innovative measures about crossing-docking in Shanghai Pudong airport and Hongqiao airport expansions, it can provide guidance and reference for the later similar construction schemes.
出处
《中国港湾建设》
2014年第9期48-51,共4页
China Harbour Engineering
关键词
不停航
道口对接
适航恢复
优化
non-suspend air construction
crossing-docking
airworthiness recovery
optimization